+20 11 00 289 896|+966 53 646 4828|info@extramile-egy.com
← All articles

Product Costing in Factories: BOM, Labour and Overheads in Odoo

Product Costing in Factories: BOM, Labour and Overheads in Odoo

Short answer: The cost of a manufactured product has four parts: raw materials (from the bill of materials, including expected scrap), direct labour, machine time, and a share of factory overheads. Many factories calculate this once on paper and keep using the same figure for years. In Odoo, each manufacturing order records what was actually consumed and how long each operation took, so you can compare actual cost with standard cost per order and per product, and adjust prices before margins disappear.

The four parts of product cost

The four parts of product cost
ItemWhere it comes from
Raw materialsBill of materials quantities × current material cost, plus expected scrap
Direct labourTime per operation × labour cost per hour of the work centre
Machine timeTime per operation × machine cost per hour (depreciation, energy, maintenance)
OverheadsFactory rent, supervision, utilities, allocated by a fair driver such as machine hours

A worked example

An illustrative product, per unit:

A worked example
AspectCalculationCost
Material A2 kg × 4080.00
Material B0.5 kg × 6030.00
Packaging1 × 55.00
Scrap allowance3% of materials (115)3.45
Labour0.25 h × 80 per hour20.00
Machine0.25 h × 120 per hour30.00
Overheads0.25 machine h × 60 per hour15.00
Standard cost per unit183.45

Now suppose a production order of 1,000 units actually consumed 4% more of material A and the line ran 10% slower. The actual cost per unit rises, and so does the gap between what you think you earn and what you really earn. Without order-level recording, nobody sees it.

Standard cost vs actual cost

  • Standard cost is the planned cost, used for pricing and quick decisions.
  • Actual cost is what each order really consumed.
  • Variances (material, labour, efficiency) show where the difference came from.

Review the largest variances each month. They point to problems in the BOM, the process, purchase prices or the time standards.

How does Odoo calculate cost?

  • Bills of materials hold material quantities and scrap.
  • Work centres hold labour and machine cost per hour; routings hold the time for each operation.
  • Manufacturing orders record actual consumption and time from the shop floor.
  • Cost reports compare expected and actual cost per order.
  • Finished goods are valued in stock at their cost, and the accounting entries are generated automatically.

Overhead allocation methods vary between factories. Agree the method with your finance team at the start, and configure it once.

Frequently asked questions

How often should standard costs be updated?

At least when material prices change significantly, and in a formal review once or twice a year.

Can we cost by-products?

Yes. By-products can take a share of the cost so the main product is not overstated.

What if operators do not record time?

Start with planned times and add shop-floor recording on the most important lines first. Partial data is better than none.

Know what your products really cost

ExtraMile implements Odoo manufacturing and costing for factories in Egypt and the Gulf.

Book a costing review or message us on WhatsApp: Egypt · Gulf

This article was drafted with AI assistance and reviewed and edited by the ExtraMile implementation team.